Taiwan case studies

Mane Energy have provided extensive recruitment support to both Changhua and Formosa 2 Offshore Wind Farm projects in Taiwan. Both Wind Farms are located along the West Coast of Taiwan. Changhua wind farm consists of the supply and installation of 21 Wind turbine Generators and foundations. Formosa 2 will consist of the supply and installation of 47 wind turbine generators.

Our client will be responsible for the foundation design fabrication and installation of the turbines - as well as the overall design, supply and installation of the subsea cables.

  • Rigger Foreman
  • Deck foreman
  • Cable Lay Superintendent
  • Supervisors
  • Logistics Personnel
  • Project Controls Personnel

To find the appropriately skilled talent for these positions, it was important to look through the already vetted options on our internal CRM. Then review applications sent in through targeted marketing campaigns and also to follow up on referrals from our trusted candidate talent pools.

As of July 2020, we have successfully mobilised a number of diversely skilled candidates to Taiwan, assisting with diligent onboarding, COVID-19 virus testing and travel logistics. Mane ensure all candidates are fully certified, facilitating any pre-requisite refresher training and checking / verifying relevant medicals and right to work are in date.

Having the opportunity to positively contribute to the emergence of renewable energy capabilities as well as play a proactive role in the construction of wind farms in Taiwan is extremely rewarding as a business. Mane's ability to support a vast array of geographies globally with proactive and innovative recruitment methods with the vest best talent worldwide is a real triumph and something we are very proud of.

Back